Carlton St.

permeable-pavement

Carlton St. is located in the Fruit Belt near the Buffalo Medical Campus. The Buffalo Sewer Authority project on Carlton was completed in 2012 and included porous asphalt between Rose St. and Orange St. with a total cost of about $400,000.

The porous asphalt has a storage capacity of about 200,000 gallons underneath the pavement surface.