Green Infrastructure PILOT PROJECT
GREEN STREET APPLICATION for CSO NO.060
CLARENDON PLACE: BUFFALO, NY
Pervious Pavement
- Reduces peak velocity and volume of stormwater runoff delivered to storm sewer system
- Recharges groundwater supply
- Reduces total amount of impervious cover
- Requires less need for curbing and storm sewers
- Provides better traction in icy conditions than traditional asphalt
- Considered Best Management Practices (BMPs) recommended by the EPA for the management of stormwater runoff on a regional and local basis
- Pervious Pavement Allows Infiltration of Stormwater
- Pervious Pavement in winter months help reduce slush and slick surfaces